New Port Project

There are no translations available.

PROJECT SUMMARY

Description Dredging and Construction of New Port and Access Channel
Scope Dredging, Reclamation, Excavation, Quay Structures including Quay Wall and Access Channel Construction
Volume Excavation:  2.5 km2 |  Dredging: 300 m wide X 10.5 km long access channel
Period 5 years +/-
Location between Al Wakrah and Mesaieed
Client New Port Project Stearing Comitee

 

Gallery:


A key objective of the NPP is to replace the existing Doha Port as the main commercial port of Qatar.  The current location of Doha Port is incompatible with plans for the development of waterfront areas within the city and therefore the Government has decided to relocate the port to a site nearer existing and future industrial zones.

The Site

The NPP will be constructed at an inland site approximately 25 km south of Doha City, between Mesaieed and Al Wakrah.  The site for the NPP has been allocated within Emiri Decree No. 35 of 2009.  It is strategically located to allow easy access to the existing and planned industrial zones south and west of Doha including Mesaieed Industrial City, Qatar Economic Zone 3, and the Doha industrial area.

Throughput and schedule

The NPP is to be designed for an ultimate throughput which includes:

  • 6 million Twenty-foor Equivalent Units (TEU) of containersized cargo;
  • 1.7 million tonnes of general cargo;
  • 0.96 million tonnes of grain; and
  • 500,000 vehicles